luofu black

Temporary Road Studs for Road Construction and Work Zone Safety

Temporary road stud is designed for road construction and work zone safety applications. It provides high-visibility lane guidance for drivers in construction areas, helping improve traffic management and reduce accident risks. Manufactured from a flexible, high-visibility fluorescent yellow engineered polymer, this stud is built to flex under vehicle loading without snapping. Fitted with dual-sided high-performance retroreflective prisms, it acts as the primary choice for overnight highway maintenance, utility road works, and tactical traffic control.

Temporary road studs for construction zones and roadwork safety, providing high visibility lane guidance in work areas

Body Material: High-flexibility, impact-modified engineered soft plastic (engineered to bend slightly under load without shattering; distinct from rigid permanent ABS studs).

Reflective Inserts: Dual-sided high-efficiency PMMA micro-prism lenses (primarily available in Amber Yellow and Crystal White).

Standard Dimensions: 110 × 90 × 22 mm (Low profile ensures vehicles pass smoothly without jarring impacts).

Compressive Capability: Rated for 10 Tons temporary loading. Engineered for passenger vehicles and light commercial trucks during short-term lane splits; not intended for long-term heavy-axle freight path tracking.

Body Finish: Uniform fluorescent safety yellow (international highway warning standard).

Installation Method: Flat-bottom design optimized for temporary cold-applied road adhesives or butyl tape pads. Designed for clean removal without leaving permanent pavement damage.

Ingress Protection: IP65 weatherproof rating against seasonal downpours.

Zero Pavement Damage Upon Removal: Eliminates the need for mechanical anchors or deep core drilling. Once construction concludes, the studs can be cleanly pried up without tearing the structural asphalt or concrete base, saving municipal restoration costs.

Ultra-Lightweight & Lower Logistics Costs: Weighing just 60 g per unit, thousands of studs can be consolidated into minimal shipping volume, lowering sea and inland freight overheads.

Rapid Deployment: Requires no heavy power tools or technical training. A single road worker can secure hundreds of linear meters using standard quick-set road adhesives, minimizing workers’ exposure to live traffic.

High Contrast Day & Night Signaling: Combining a bright fluorescent shell with high-output reflective inserts ensures excellent visibility across extended viewing distances, keeping work crews safe day and night.

Primary Layouts: Nighttime highway resurfacing bypasses, municipal utility trenching, marathon or cycling race lane separation, temporary event parking layout management, and emergency traffic control.

Not Recommended For: Permanent structural highway marking; sub-zero routes with heavy snowplowing operations; deep water-logged marsh paths.